What is the process?
- Work with a Pacific Steel Buildings representative
to design a building to suit your needs.
- The design is sent to engineering to create the two sets
of "wet" stamped blueprints for your building
and foundation.
- Apply for a permit to build your
building.
- permit regulations vary by
County and State, start investigating the requirements
in your area as soon as you have decided to add
a building to your property.
- Make arrangements to have the building
erected.
- Your permit returns from your county and then your representative
orders your building.
- Building is delivered to your site.
Are there other things I need to think
about?
- Snow loading, wind speed, exposure, soil density variances,
etc.
- Aesthetics.
- Windows.
- Trim.
- Siding Choices.
What clearances are needed for the door selected?
- For overhead doors you need 24” additional height for
door track and 12” on each side for the side door track.
- What are you putting in the building? If your boat
and trailer have a combined height of 10 feet, you
need to plan on a building with 12 foot doors
- Consider a canister door to save space.
How can the Multibuild™ program help me?
- Multibuild™ allows your representative to accurately
design a building to your specifications. The program instantly
calculates the price of the finished product (no more waiting
days or weeks for a bid). With Multibuild™ we can design
the building which fits your needs AND budget too!
|